Tubing  is used to transport oil after drilling is completed

Home/Tubing  is used to transport oil after drilling is completed

Tubing  is used to transport oil after drilling is completed

KPE tubing is  used to transport  oil or natural gas from the producing formations to the field surface facilities for processing after drilling is completed. During the extraction process, the OCTG  tubing must withstand the pressure and it must be adequately strong to resist loads and deformations associated with production and workovers.

Tubing  is used to transport oil after drilling is completed

In addition, tubing generally is sized to satisfy the expected rates of production of oil and gas. That is because if tubing is too large, we will have an economic impact beyond the cost of tubing oil and gas itself, however, if API tubing is too small, it will restrict the production of oil or gas, and if things continue this way it will impact subsequent economic performance of the well. Generally, tubing is manufactured in the same way as casing, except an additional process known as “upsetting” which is applied to thicken the pipes.

In our company KPE, outside diameter of tubing is from 1.660” to 4 1/2” (42.16mm to 114.3mm),the wall thickness is from 2.3 PPF to 26.10 PPF (3.57mm to 9.52mm). Based on the standard of API 5CT, ISO11960, GOST, and their steel grades include H40, J55, N80, N80Q, L80, L80-1, L80-9Cr, L80-13Cr, P110 etc. As you known, the length range is R1 (6.10-7.32M), R2 (8.53-9.75M), R3 (11.58-12.8M), and R2 is used frequently.Besides EU and NU end type could be provided by KPE, IJ and premiums thread type are also available.

2017-10-26T10:24:26+08:00 October 28th, 2017|